South Mekong - Project & Partner

Mountains

SONG KHE DUONG BRIDGE DA LAT - NHA TRANG

Using 02 70 tons and 50 tons tire cranes for the crane to install 20 rear stretch I33 beams
SONG KHE DUONG BRIDGE DA LAT - NHA TRANG
Mountains

THUAN PHUOC BRIDGE - DA NANG

Using 02 chain cranes of 100 tons and 80 tons to serve the construction of the bridge
THUAN PHUOC BRIDGE - DA NANG
Mountains

SUOI DAU BRIDGE - NHA TRANG

Using two 50 tons and 45 tons tire cranes to install stretch I33 beam
SUOI DAU BRIDGE - NHA TRANG
Mountains

DAP TRAN THUY DIEN SÊ RÊ PỐC 3 BRIDGE

The dam is 22.5m high, includes 5 spans, 2 wing beams each span, each beam weighs 60t x 18m. Used 02 80t chain cranes for construction and has completed the job after 03 consecutive days of construction.
DAP TRAN THUY DIEN SÊ RÊ PỐC 3 BRIDGE
Mountains

SONG CAU BRIDGE - KHANH HOA

Using 02 70 tons and 45 tons tire cranes to crane the installation of 30 rear stretch I33 beams
SONG CAU BRIDGE - KHANH HOA
Mountains

CAO TỐC TRUNG LƯƠNG MỸ THUẬN - TIỀN GIANG

Vận chuyển và lao lắp dẫm SPT
CAO TỐC TRUNG LƯƠNG MỸ THUẬN - TIỀN GIANG
Mountains

CAO TỐC TRUNG LƯƠNG MỸ THUẬN - TIỀN GIANG

Vận chuyển bằng sà lan và lao lắp dầm I33, T ngược từ
CAO TỐC TRUNG LƯƠNG MỸ THUẬN - TIỀN GIANG
Mountains

CAO TỐC LONG THÀNH BẾN LỨC - ĐỒNG NAI

Vận chuyển và lao lắp dầm SPT

CAO TỐC LONG THÀNH BẾN LỨC - ĐỒNG NAI
Mountains

CAO TỐC LỘ TẺ RẠCH SỎI - KIÊN GIANG

Vận chuyển và lao lắp dầm SPT

CAO TỐC LỘ TẺ RẠCH SỎI - KIÊN GIANG
SOUTH MEKONG MULTI MODE COMPANY LIMITED
Address: 1A, D3 Street, Binh Duong, Long Binh Tan Ward, Bien Hoa City, Dong Nai Province, Vietnam
Tel: (+84) 251 3833 860 - Fax: (+84) 251 3833 396
Tax code: 3702098337
Bank account: 0481000750770 (Vietcombank)
Email: info@southmekong.vn - sales@southmekong.vn
Website: www.southmekong.vn
CONNECT WITH US